Action required before generating the final report:
|
▪Ensure that the total cumulative hours for the month meet or exceed the minimum required by the CCQ for employees with status H or I, and make the necessary corrections.
IMPORTANT
⇨ Error E90 (27) is considered as non-compliant data in the simulation-type report. If the minimum is met by the end of the period, the final simulation report will not be blocked, and the payroll service will be able to transmit the final report and remittance to the CCQ.;
⇨ Error E90 (27) becomes a blocking error if it is not corrected before the production of the final-type report. If the minimum is not met by the end of the period, the Final report will not be generated: you must transmit the report and remittance to the CCQ yourself. |